Check that the gas cylinders are all on and have plenty of gas (the pressure inside a full cylinders is about 1500 psi).
Open furnace lid. Open growth tube carefully. Place sample within growth tube. Use the quartz push rod to slide the sample to the center of the furnace.
Close growth tube. Establish vacuum seals to the quartz tube. Close furnace lid.
Set purge parameters in automated program.
Make sure furnace and power supplies are on.
If you are doing alcohol growth add ice and water to the beakers that the bubblers are in.
Press the start button on the automated growth display panel.
Allow system to cycle.
Set growth parameters in automated growth program.
Press the start button on the automated growth display panel.
Allow system to cycle.
At 400C, safe to open furnace lid (speeds up cooling process)
At 200C, safe to handle growth tube and retrieve sample.